Next, I was able to get some work done on the Building 28. I got the roof tiles on and have them taped down. I also put lintels above the doors and a shelf below each window. I have the ridge tiles cut for the roof but may not quite have enough. Will have to check. I also 3d printed some chimneys for the building. I didn't plan for the chimneys when I did the roof. This may cause me issues.
So where am I with this? Actually, I think I am more than half way done. Here is the setup with the buildings i have so far:
I am really onely missing one building. I plan on buying a rowhouse that will sit behind the L shaped buildings. There are some stone walls that I have that need to be added and I need to print some more fences for around building 28. These will be 3d printed. I am happy with the progress so far.