Tuesday, May 27, 2025

Singling Buildings 8 and 9

I made some progress on both buildings. The rowhouse, building 9, was base coated and the roof and chimneys are on. I will have to paint the chimney tops black but the brick paper is on. The roof will need to be painted still. The upper floor is painted. I am going with a dark wood for the shutters and white for the sills and window frames while the rest of the house is a dirty white. I think I have at least three more hours of work to finish this with its gardens.

Building 8 is just getting started. I have some of the roof in place. I will be using brick paper for this. I don't think I will put too much effort into this building.

The school is still sitting in its same state of incompleteness. I decided that i will just manually make the windows for the back and the side. I have had nothing but trouble with my 3d printer. I hope to get it fixed but am just not sure what to try next.

I also have some pillboxes that I picked up off of ebay. I am happy with them They match the singling AT bunker and the small machine gun bunker fairly well./ They still need to be painted.

I did manage to get my winter trees finished. I am very happy that these are done. I sould have everything I need for Table 1 of the Singling battle. Table 3 should be mostly ready. I just have Buildings 8, 9, 12 and the school left for table 2.

1 comment:

  1. Thank you. I am really trying to take my time with this build and do it right. I hope it pays off.

    ReplyDelete